Power shortfall jumps to 2796 MW - The Nation, Pakistan Print
The Nation, Pakistan
The hydel generation stood at 6664 MW, WAPDA thermal 1496 MW, IPPs 5137 MW and Renal 124 MW. As many as 690 MW was supplied to Karachi Electric Supply Company(KESC), the report further said. The hydel generation witnessed sharp increase and stood at

...